INSTALLATION AND RUNNING COST
Below is a rough cost guide to supply and install hydronic heating.
*Based on residential new construction, all standard equipment and a standard efficiency boiler.
Please feel free to submit your plans here:
PRICES EXCLUDING GST
Panel System Installation Cost
1) 3x panel system $6,500 - $7,500
2) 7x panel system $9,000 - $10,000
3) 11x panel system $10,500 - $11,500
4) 15x panel sysem $12,500 - $13,500
Existing homes add $0 - $3,000 depending on access and degree of difficulty,
In-Slab Heating Installation Cost
1) 100m2 Square home. 6x circuit $7,000 - $8,000
2) 200m2 Square home. 12x circuit $10,000 - $11,000
3) 300m2 Square home. 2x (9x circuit) 2x Zone controlled system $14,000 - $15,000
Additions to your heating system
ADD 2 zone control system $2000
ADD white towel rail $400
ADD domestic hot water $750
ADD WIFI / PHONE CONTROL $950
ADD Extended boiler warrenty $100 per year
ADD Thermostatic control heads $65 per control
ADD high efficiency boiler $800
RUNNING COST
In terms of your running cost it is very hard to give an projected running cost however Sustainability Victoria have some really good estimated figures. *Just base it of the reverse cycle figures for electric heat pumps.
GAS BOILER HEATING CLICK: https://www.sustainability.vic.gov.au/You-and-your-home/Save-energy/Heating/Heating-running-costs
*ELECTRIC HEATING HEAT PUMP CLICK: https://www.sustainability.vic.gov.au/You-and-your-home/Save-energy/Cooling/Cooling-running-costs
Here are the factors that they use below.
Approximate costs per year, based an average existing (pre-2005) 2 Star house in a Melbourne climate, heating to 20°C all day on the weekend (7am to 10pm) and in the morning (6am to 9am) and evening (5pm to 11pm) on weekdays, as needed.
Based on an electricity tariff of 31.9c/kWh. Gas tariffs are based on a declining block structure, which means the unit cost of gas decreases as gas use (or area being heated) increases. Gas tariffs used for room heating: 12m2 – 2.75c/MJ; 30m2 – 2.64c/MJ; 60m2 – 2.45c/MJ.
Gas tariffs used for central heating: 100m2 – 2.32c/MJ; 160m2 – 2.17c/MJ; 220m2 – 2.09c/MJ. The energy tariffs do not include any pay on time discount, or any fixed supply charge.
The figures for "zoned" operation assume that heating in the bedroom areas is switched off during the day (9am to 5pm) on the weekends. The zoning does not affect the operation of the heating on weekdays, as the house is not occupied during this time and the heating is assumed to be off. Other zoning arrangements are possible, and would change the saving achieved by zoning.
Actual costs for your house will depend on the area heated, how long you run the heating for, your thermostat settings, how well insulated the house is, your energy tariffs and your local climate.
To estimate the running cost for a cold climate (e.g. Ballarat) multiply these figures by 1.3, and for a warm climate (e.g. Mildura) multiply these figures by 0.7.
To estimate the running cost for a 5 Star house in a Melbourne climate multiply these figures by 0.4, and for a 6 Star house multiply these figures by 0.3.
Other things to keep in mind is doesn’t factor in real world running such as night time cycles and defrost cycles which will add a large power draw. Also the off and on cycles will increase the power consumption vs maintaining a constant temperature.
1) Fault find and repair- $190.00+GST (excluding part replacement. To be quoted on site )
2) General works- $190+GST Call out fee (minimum charge) first 60mins. Additional time on site. $23.75 (per 15mins)
3) Hydronic heating service- $220.00+GST (1 Boiler per service, extra boilers $95.00 each)